Search
☼ Prescott eNews ☼
PRESCOTT WEATHER
PRESCOTT VALLEY WEATHER

Epoxy Chip Seal Bridge Deck Preservation on Iron Springs Road

Please be advised that Sunland Asphalt & Construction, LLC in conjunction with Yavapai County will be performing epoxy chip seal operations on three bridge decks on Iron Springs Road in Yavapai County. The areas include bridge decks at mile post 18.06, 23.27, and 24.24. Construction work will include spall repair of the existing bridge deck and the application of an epoxy chip seal friction course. Construction will begin May 15, 2023 and continue through June 2023. One lane of traffic will remain open at all times; however, motorists may encounter lane restrictions, reduced speeds, and flagging operations throughout the work zones. Motorists should expect minor delays and allow extra time to get through the construction area. Please follow all traffic control devices when travelling through the work zone.

For additional information, please contact Yavapai County Public Works at 928-771-3183 or visit us on the web at www.yavapaiaz.gov/publicworks

How useful was this article ?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

We are sorry that this post was not too useful for you!

Let us improve this post!

Tell us how we can improve this post?

Facebook Like
Like
LinkedIn
Pinterest

Related Articles

Scroll to Top